Project Details
The challenge was to build a multi-temperature-zone cold storage facility that would be capable of withstanding Florida’s annual hurricane-force winds.
This massive project evolved from a bid spec for a specific building, into a design-build opportunity. Allied kept a flexible approach to designing and engineering this project, easily adapting to the developing interior environmental design. Strong communication, daily hands-on management and meticulous attention to detail were key factors in keeping this huge project moving forward to a successful completion. Allied coordinated the consultants and resources needed to complete this impressive climate controlled building.